Always used staged imaged versions (Completed)

Some customers use automated deployments to update their images and host pools automatically.  This method usually uses a UAT/Test host pool for users, and IT Admins can validate the images. 

It would be good to have an “always use the staged image version" option, which would use a staged image if one were available. The current way of doing this is that if a new staged image is created, we must manually select the new staged version in the autoscale configuration. 

A similar request has already been raised here - https://nmehelp.getnerdio.com/hc/en-us/community/posts/25307717355789-Option-to-prefer-or-not-Staged-images-in-auto-scale?input_string=Always%20used%20staged%20imaged%20versions

 

2

Comments (2 comments)

0
Avatar
Marek Sokół

Fully agree, what even more when creating new test host pool but currently no staged image is available I need to choose production image, and remember to reconfigure host pool setting when new staged image is available.

0
Avatar
Christophe Fettouhi

The option should be to set up af test hostpool as a stating hostpool like we can with a validation hostpool and then have it on a schedule reinstall the VMs so you just have to login af test.

Please sign in to leave a comment.